New Build Extension to Warehouse, Eurocentral

Client – Mersen Scotland Holytown Limited

Project Sector – Private Sector

Project Description – New build 9,000ft² high bay warehouse including extension to existing concrete yard.

Role – We were appointed Main Contractor after a recommendation from the 2 next door neighbours for whom we had just completed a 40,000ft² £1.4M new build project (Opalion) and a 9,000ft² £650K warehouse extension (Consarc). We undertook to design, manage and co-ordinate the construction works using both sub-contractors and our own direct labour.

The works involved the construction of a steel framed structure with insulated walls and roof panels, connecting into the existing factory through new openings and a covered canopy.

The concrete floor slab and concrete yard area was one of the most important factors on the project where a perfect finish was achieved due to carefully managed preparation and close site supervision of the works.

This new extension was required to be built with minimum disruption to the operation of the Client’s manufacturing business. This was achieved due to close communication with the Client’s operational staff and scheduling deliveries to minimise disruption. 

This project was handed over on schedule with zero defects.