SITE WASTE MANAGEMENT POLICY STATEMENT 2014

SIM Building Group are committed to conducting their business in a manner which is both professional and ethical whilst at all times paying attention to their environmental responsibilities including the correct disposal, re-use and segregation of waste:

These responsibilities will be addressed by implementing the following:

  • Strict compliance with all relevant legal requirements, codes of practice and regulations;

  • Organise our operations in order to minimise waste by considering materials and the method of construction at the design stage. We will forecast the type of waste and how it will be managed before construction commences;

  • Seek to minimise waste by drafting a Site Waste Management Plan (SWMP)  identifying the types of waste, recording any design stage considerations and build waste management targets into tender specifications;

  • Train all staff to improve awareness of re-using materials and providing regular toolbox talks on site with workers;

  • Careful selection in the choice of equipment, materials and working methods to make the most efficient use of stores, resources and leftover materials;

  • Encourage energy savings throughout the company by ensuring that all power appliances and equipment is switched off when not in use. Re-use of parts and components where possible and encourage re-use of stationary in office and materials on site until unserviceable;

  • Order stationery/materials in bulk where possible in order to avoid unnecessary deliveries, therefore, reducing direct cost and fuel usage emissions;

  • Encourage customers to specify materials and equipment which has the least environmental effect during manufacture, when in service, and which can be recycled at the end of its life;

  • Ensure disposal of waste through approved disposal contractors in compliance with existing legal controls and retain waste disposal notes for all transactions removed from site. All bulk waste paper disposals will be sent to recycling unit;

  • All records of SWMP’s will be retained on site for inspection throughout the contract and retained in the office for 2 years after completion (A copy will also be given to the client on completion);

  • Apply lessons learnt and resources saved to each new site;

  • As waste is processed on site, the SWMP will be updated and reference made to waste transfer notes on an ongoing basis for all trades;

  • General waste to be disposed of using segregated skips provided under contract arrangements. Larger skips to be used to reduce vehicle movements and ensure skips are full prior to exchange.

Martin Sim (Managing Director)


Rev. 01: April 2014
Review: March 2015


policies
1 Roman Road, Kirkintilloch, Glasgow, G66 1DY.
Tel: 0141 776 5151     Fax: 0141 777 8103
Email: sim.group@simbuilding.com
policies

portfolio
SIM work with a number of private and public sector clients covering a broad spectrum of industries. Here you will find a sample of the projects we have been involved in.
view portfolio
  • constructionline
  • National House Building Council
  • Glasgow Building Contractors Training Group
  • Contractors Health and Safety Assessment Scheme
  •  9001
  • 14001
© Sim Building Group, 1 Roman Road, Kirkintilloch, Glasgow, G66 1DY, Scotland.